The Philander Smith University’s Dr. Joycelyn Elders School of Allied and Public Health is a renovation to the existing Harry R. Kendall Health and Science Center building. The renovation took the south wing of the second floor of the building and replaced former chemistry labs with nursing teaching spaces. These spaces include skills labs, control/observation spaces, debriefing rooms, computer labs, and office spaces to support the program. There are nine nursing bed locations with a simulation dummy, hospital bed, and headwall. Each headwall includes oxygen, vacuum, and medical gas, simulating the experience that would take place in a real-world medical environment.
It was critical to the University to maintain the use of classrooms during school hours. The construction took place over the spring academic semester and the summer break. The building remained open the entire time and classes took place during construction. Special consideration was taken to perform the most disruptive work during evenings and non-classroom hours. This included not just construction noise, but also fire alarm and sprinkler testing, elevator testing, and utility shut-offs and tie-ins.
Size
Services
Architecture
Engineering
Construction Services
Size
Services
Architecture
Engineering
Construction Services
The Philander Smith University’s Dr. Joycelyn Elders School of Allied and Public Health is a renovation to the existing Harry R. Kendall Health and Science Center building. The renovation took the south wing of the second floor of the building and replaced former chemistry labs with nursing teaching spaces. These spaces include skills labs, control/observation spaces, debriefing rooms, computer labs, and office spaces to support the program. There are nine nursing bed locations with a simulation dummy, hospital bed, and headwall. Each headwall includes oxygen, vacuum, and medical gas, simulating the experience that would take place in a real-world medical environment.
It was critical to the University to maintain the use of classrooms during school hours. The construction took place over the spring academic semester and the summer break. The building remained open the entire time and classes took place during construction. Special consideration was taken to perform the most disruptive work during evenings and non-classroom hours. This included not just construction noise, but also fire alarm and sprinkler testing, elevator testing, and utility shut-offs and tie-ins.