[ News + Insights ]

Brent Hamling: Healthcare Lighting Extraordinaire

January 26, 2021

[ News + Insights ]

Brent Hamling: Healthcare Lighting Extraordinaire

[ Location ]
Brent Hamling: Healthcare Lighting Extraordinaire

[ News + Insights ]

Brent Hamling: Healthcare Lighting Extraordinaire

January 26, 2021

Brent Hamling has always been fascinated with complex electrical engineering projects.

“As a kid I enjoyed tinkering with electronics and simple circuits,” Brent said. “By Junior High I decided to pursue an electrical engineering degree and stuck with it. In college I enjoyed control systems and initially went down that path.”

After college, Brent worked at a firm building control systems and programming controllers for manufacturing plants. But, soon realized he wanted another challenge. He joined Cromwell in 2001 and never looked back.

“One of the very first projects I worked on at Cromwell was the north lobby at Arkansas Children’s,” Brent said. “It’s an interesting space. I got to do a lot of design I had never done before.”

Working on this project spurred Brent’s love for medical projects.

“Medical projects are my favorite to work on,” Brent said. “They’re the most challenging but also the most rewarding. It’s like putting a puzzle together, figuring out how to comply with various codes and provide what the architect wants in a way that is safe and appealing to the public.”

Brent’s favorite project to have ever worked on is the Winthrop P. Rockefeller Cancer Institute at University of Arkansas for Medical Sciences.

“It was challenging to determine how to apply the codes and make it all work in a high-rise building,” Brent said.  “And, it had some really cool architectural features and interesting lighting. Helping create a place for people fighting cancer was rewarding. They do amazing work there.”

Brent enjoys contributing to long-lasting projects.

“One day when I retire I hope to go across the city, state, country, and world and see buildings, both new and renovations, that I’ve had a part in,” Brent said. “Knowing they’re sustainable, that people enjoy going to work there, and that the work we did makes their jobs easier is gratifying. And from the medical aspect, knowing that we’re helping patients with their struggles is a great feeling.”

One of those projects will most certainly be the one he’s most proud of, the South Wing at Arkansas Children’s. It’s an institution where he’s dedicated over 8,500 hours on 257 different projects.

“It is the largest medical project I’ve ever worked on,” Brent said. “It sounds cliché to say it’s important because it’s for the kids, but that’s exactly what it is.  Helping provide a great environment for them is a personal accomplishment.”

From Bank to Mixed Use Space: The Revitalization of 100 W Emma

From Bank to Mixed Use Space: The Revitalization of 100 W Emma

From Bank to Mixed Use Space: The Revitalization of 100 W Emma  In 2022 Cromwell partnered with Shiloh Investments Group to re-design and revitalize 100 W Emma Avenue, a well-known building in downtown Springdale, Arkansas, into a dynamic mixed-use space.   Historic...

Blake Shahan Earns Certified Plumbing Designer Certification

Blake Shahan Earns Certified Plumbing Designer Certification

Cromwell is proud to share that Blake Shahan has earned his Certified Plumbing Designer Certification from the American Society of Plumbing Engineers (ASPE). Blake holds a degree in Mechanical Engineering from the University of Arkansas at Little Rock and has been a...

Ortiz Jauregui Recognized by AIA Arkansas

Ortiz Jauregui Recognized by AIA Arkansas

Cromwell is proud to recognize our Architectural Department Intern, Valeria Ortiz Jauregui, for her selection to be a part of AIA Arkansas ELEVATE Exhibition at the AIA Arkansas Conference in Hot Springs, Arkansas.  The ELEVATE Exhibition highlights the work of select...